Getting amassed treasured encounter in cooperating with international buyers, EPG will always adhere to it enterprise spirit of becoming useful, modern, productive and superb to make the prime global transmission travel. Meanwhile, our items are manufactured according to substantial good quality expectations, and complying with the worldwide sophisticated common conditions. Search phrases colon Shovel loader comma Wheel Loader comma entrance loader comma loaEPTfor sale comma wheel loaEPT3ton
Our positive aspects colon
-We make most of the parts in our very own factory comma better to control the good quality comma less difficult to get components in the EPT
-Genuine warranty for good quality colon we will provide areas as free of charge within guarantee if good quality issue
-EPT ordeals in this marketplace colon we commenced to exporting loaders from yr 2008 interval
Functions of this product 3ton loader colon
1 rpar The wheel loaEPTuses XiHu (West Lake) Dis.hu (West Lake) Dis.feng EPT engine with less oil consumption comma low noise and little emissions time period
2 rpar EPT and torque converter of five ton wheel loaEPTare of very good applicability period of time
three rpar Optimally made working gadget and frames of wheel loaEPTare much better and more sturdy period
four rpar EPT responsibility unloading EPT system enhances the EPT wheel loaEPTperformance interval
5 rpar The wheel loaEPTuses ideal EPT cylinders comma pumps and valve period
Specifics colon
1 rpar EPT motor comma 130HP comma 6 cylinders comma 4 strokes comma water cooling comma turbocharged comma EPT guarantee period of time ZL50 planetary kind EPT with EPT converter comma two EPT and one reverse speeds comma same as 5ton wheel loader comma more powerful for hefty duty period EPT EPT shift time period EPT axles with caliper sort provider brake interval
2 rpar The robotically welded two-piece structural frame design and style offers a rugged and reliable foundation for the EPT that improves stability comma performance comma and serviceability time period A sturdy articulating hitch method joins the front and rear frames bettering sturdiness period Increased line routings across the hitch joint streamline the producing process and improve dependability and toughness period
three rpar EPT structural parts are all made by EPT interval All the parts are higher good quality welded period The ball blasting and vibration treatment can launch the welding stress time period UT lparEPT Tests rpar to inspect the welding defect period of time It will kind a whole lot of modest pits on the floor soon after blasting and it will enhance the paint adhesion interval
four rpar The strong axle makes use of a major EPT and two hub EPTs which are related by two shafts period of time The primary EPT employs EPTl EPTs and the hub EPT uses world EPTs period Dry sort caliper brake utilizes a brake shoe with a brake disc period It is better for upkeep and radiation interval
five rpar The radiating location of the large top quality radiator is additional for much better radiation period The temperature of the motor and the EPT can be managed unEPTthe temperature boundaries period It extends the support existence the two of the motor and the EPT period And it lowers the oil leak of the hoses and in the meantime the provider life of hoses is prolonged way too time period
six rpar Luxury cabin is equipped each air conditioner and electric fan period Radio with SD card interface is stXiHu (West Lake) Dis.Hu (West Lake) Dis.rd period The spacious cabin assures the comfortable operation and rest setting for the operators period of time
7 rpar One EPT EPTstick manage is optional period The EPTstick can be moved EPT and again to handle the growth lifting and down time period The EPTstick can be moved still left and rigEPT to management the bucket dumping and loading period of time It is easy for procedure and the efficiency is a lot larger than the two EPT manage program period of time
eight rpar The steering wheel position can be a small adjusted interval The instrument panel consists the meter of water temperature comma the meter of oil temperature comma the meter of fuel degree comma the meter of air force and the counter of functioning hours interval The switches for lights are blended in the panel way too time period
Optonal attachments
-coal bucket
-rock bucket
-fast alter hitch
-wood grapple
-grass grapple
-pallet fork
Loading and deal
-1 unit for every 40HQ container or 2 units in a 40HQ and a 20GP containers
-disassembling cabin and bucket
-cabin in a metal body
-main physique EPTd into container straight
-fixed with professional steel ropes
Guarantee and servce colon
1 rpar One year guarantee for EPT EPT interval
2 rpar All spare components are available as we produce most of the components in our manufacturing unit time period
3 rpar We can offer complex support by way of mail comma phone comma video or sending engineers there period of time
four rpar EPT operation and servicing manul and areas checklist are delivered with the loaders period
Our products assortment colon
We generate wheel loaders with bucket capacity from 1 period8m3 to 3m3 period
We also generate excavators from 1 period8ton to 42ton interval
All EPTs are CE certificated time period
Our manufacturing unit tour colon
We produce most of the elements and it is better for quality management program period of time And it is simple to get the spare areas from us directly also time period
Technical specs colon
Simple Knowledge | |
Bucket capability | one period8 m sup3 |
Rated load | 3200 kg |
Operation excess weight | 12440 kg |
Dumping height | 3060 mm |
Dumping achieve | 1008 mm |
Breakout drive | 97 kN |
Traction pressure | 100 kN |
Wheel foundation | 2750 mm |
Total EPT cycle time | ten period3 s |
Complete bucket lifting time | 5 period6 s |
Min period turning radius | 5376 mm |
Total dimension lparL timesW timesH rpar | 6970 times2450 times3228 mm |
Motor | |
Model | CUMMINS 6BT5 period9-C130 |
Rated EPT | ninety seven kw |
Rated pace | 2200 rpm |
Max interval torque | 560 N periodm |
Gas intake | 225 g solkw periodh |
EPT Technique | |
Gear box kind | planetary EPT shift |
EPT velocity I | twelve km solh |
EPT speed II | forty km solh |
Reverse speed | seventeen km solh |
Torque converter kind | solitary stage 4 factors |
Axle variety | four-wheel EPT |
Tire dimensions | 17 period5-twenty five-12PR |